48
Flush at peak
Flush to top of OSB
roof panels
Flush to top of OSB
roof panels
2" (5,1 cm)
Finish Nails
AOL
AOR
Flush
Flush
4-1/2"
(11,4 cm)
5-5/8"
(11,4 cm)
5-1/2" x 6-5/8"
5-1/2" x 6-5/8"
2
3
Install
AOL
and
AOR
primed side facing out, fl ush at rafter peak and fl ush to top of OSB roof panels.
Fasten trim with 2" fi nish nails in pattern shown.
Install (4)
8" x 12-1/2"
shelf brackets projecting out past edge of OSB roof panels, (2) on each side of roof, as shown.
Fasten each bracket to roof panels with 2" fi nish nails.
Do not sink nails completely.
Install soffi t caps
(5-1/2" x 6-5/8")
with primed side facing out and fl ush to gable trim.
Fasten soffi t caps with (4) 2" fi nish nails.
Your gable trim is installed.
Remove temporary roof ledger-boards.
Repeat steps to install fascia on the back side.
FINISH
1
BEGIN
Flush
Flush
Flush
Flush trim up to bottom
of shelf brackets.
TEMPORARY
TEMPORARY
GABLE FASCIA
x72
2" (5,1 cm)
PARTS REQUIRED:
x2
19/32 x 3-1/2 x 81-1/4" (2,5 x 8,9 x 206,4 cm)
AOL
x2
19/32 x 3-1/2 x 81-1/4" (2,5 x 8,9 x 206,4 cm)
AOR
x2
19/32 x 5-1/2 x 6-5/8" (1,5 x 14 x 16,8 cm)
x2
19/32 x 5-1/2 x 6-5/8" (1,5 x 14 x 16,8 cm)
3/8 x 8 x 12-1/2"
(1 x 20,3 x 31,8 cm)
x4
Use shelf brackets as temporary ledger-boards to help install trim boards.
Install all trim and soffi t parts with the primed side facing outward.