37
3" (7,6 cm)
FRONT GABLE LADDERS
PARTS REQUIRED:
x4
x32
HINT:
Pre drill to avoid
splitting wood.
x6
2 x 3 x 5-1/2" (5,1 x 7,6 x 14 cm)
URB
x2
2 x 6 x 3-5/8" (5,1 x 15,2 x 9,2 cm)
LUA
x2
2 x 6 x 5-1/4" (5,1 x 15,2 x 13,3 cm)
AYB
3"
(7,6 cm)
Screws
HPP
URB x3
Arrange, measure and mark locations of (3)
URB
as shown place
HPP
on top. Secure with 3" screws as shown
(Fig. A)
.
Ensure parts are flush along edges.
2
3
4
1
BEGIN
Fig. A
Flush
Flush
2-1/2"
(6,3 cm)
Flip over gable ladder sub-assembly and fasten
HPP
to (3)
URB
with 3" screws
(Fig. B)
.
Assemble
AYB
to
LUA
with (2) 3" screws
(Fig. C)
.
Install L-block between
HPP
with (2) 3" screws in both
sides
(Fig. D)
.
Pre-drill all holes.
Turn L-block so it is flush with corner angle of
HPP
.
Repeat steps to build the 2nd gable ladder.
Fig. B
HPP
Flush
3"
(7,6 cm)
Screws
2 x 3 x 83-13/16" (5,1 x 7,6 x 212,9 cm)
58"
(147,3 cm)
28"
(71,1 cm)
2-3/4"
(7,0 cm)
83-13/16"
(212,9 cm)
3-5/8" (9,2 cm)
5-1/2"
(14 cm)
LUA
AYB
Fig. C
3"
(7,6 cm)
Screws
Flush
Fig. D
HPP
3/16" (4,8 mm) Drill Bit
Содержание RIDGEPOINTE
Страница 2: ...This page intentionally left blank...