
66
FINISH
BEGIN
1
2
3
PARTS REQUIRED:
GABLE DECORATIVE TRIM
Position gable decoration primed side facing down on top of
BZL
and
BZR
fl ush along edges and at peak.
Secure with 3/4" screws.
Turn decoration over. Align gable cleat
GI
on edge with edge of assembled decoration and fl ush at peak.
Fasten with 2" screws spaced evenly.
Pre-drill all holes
.
Install gable decoration with the primed side facing out, fl ush to back side of gable fascia and
fl ush at peak.
Secure to overhang frame with (8) 2" screws, as shown.
Your front gable decorative trim is installed.
Gable Cleat
x1
19/32 x 2-1/2 x 27-9/16" (1,5 x 6,3 x 70 cm)
BZL
x1
19/32 x 2-1/2 x 27-9/16" (1,5 x 6,3 x 70 cm)
BZR
x1
x8
3/4" (1,9 cm)
Primed
Side
OUT
Flush under
soffi t panel
Flush at
PEAK
2" (5,1 cm)
Screws
Flush
Flush
BZR
BZL
Flush
3/4" (1,9 cm)
Screws
Primed Side
DOWN
Primed Side
DOWN
Primed Side
DOWN
x2
19/32
x 2-1/2 x 23" (2,5 x 6,3 x 58,4 cm)
GI
x14
2" (5,1 cm)
Flush
Flush
Flush
GI
GI
2" (5,1 cm)
Screws
Primed
Side
UP
Primed Side
IN
Содержание RIDGEPOINTE
Страница 2: ...This page intentionally left blank...