44
PARTS REQUIRED:
EAVE SOFFIT
x48
Place
79-3/4"
and
71-1/4"
soffi t boards primed side down on bottom side of rafter and nailer.
Flush soffi t board to front corner of overhang L-block
(Fig. A)
, side wall panels and nailer
(Fig. B)
.
Secure with 1-1/4" screws spaced 12" apart and angled into rafter at seam
(Fig. B, Fig. C)
.
BEGIN
1
Repeat steps to install soffi ts on opposite side.
Your eave soffi t panels are installed.
FINISH
5-3/16"x 79-3/4"
5-3/16"x 71-1/4"
x2
3/8 x 5-3/16 x 71-1/4" (1 x 13,2 x 181 cm)
x2
3/8 x 5-3/16 x 79-3/4" (1 x 13,2 x 202,6 cm)
Fig. A
Flush to
outside
of panel
1-1/4" (3,2 cm)
Screws
12"
(30,5 cm)
SIDE VIEW
Soffi t Nailer
Rafter
1-1/4" (3,2 cm)
Screws
Primed Side
Down
Fig. C
1-1/4" (3,2 cm)
Screws
Fig. B
1-1/4" (3,2 cm)
Flush at
corner
Flush
Install all trim and soffi t parts with the primed side facing outward.
HINT:
Pre drill to avoid
splitting wood.
3/16" (4,8 mm) Drill Bit
Содержание RIDGEPOINTE