
41
FINISH
Your (2) gable fi llers are now installed
GABLE PEAK FILLERS
x4
3" (7,6 cm)
3/16" (4,8 mm) Drill Bit
HINT:
Pre drill to avoid
splitting wood.
HINT:
Pre drill to avoid
splitting wood.
3" (7,6 cm)
Screws
3" (7,6 cm)
Screws
Install back gable fi ller support
UVE
fl ush to back rafter.
Secure with (2) 3" screws angled into rafters.
Install front gable fi ller support
WAF
over fi ller panel and fl ush to vertical gable connectors.
Check
WAF
for level.
Secure with (2) 3" screws, as shown.
Install (1)
7-1/4" x 18-1/4"
gable fi ller panel fl ush to installed gable panel. Center the panel.
Secure with (4) 1-1/2" nails into rafter and (1) 1-1/2" nail into
UVE
.
Install front
7-1/4" x 18-1/4"
gable fi ller panel fl ush to installed gable panel. Center the fi ller panel.
Secure with (4) 1-1/2" nails into gable ladder frame.
1
BEGIN
3
2
4
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
UVE
Outside View
Inside View
WAF
7-1/4" x 18-1/4"
7-1/4" x 18-1/4"
1-1/2" (3,8 cm)
x9
Install gable fi ller panels with the primed side facing outward.
PARTS REQUIRED:
Flush to
panel.
Flush to
panel.
Flush
Flush
Flush
Flush
x2
7-1/4 x 18-1/4" (18,4 x 46,4 cm)
WOOD GRAIN
x1
2 x 3 x 10-5/8" (5,1 x 7,6 x 27 cm)
UVE
x1
2 x 3 x 20-1/2" (5,1 x 7,6 x 52,1 cm)
WAF
Содержание RIDGEPOINTE
Страница 2: ...This page intentionally left blank...