38
5. HANDLING PRECAUTIONS
Caution
8. Sample distribution
Supplied chamber rack capacity is 15kg each. Place items as evenly and as far apart as
possible and do not exceed maximum load rating. Bunching multiple together in order to
get more onto a single rack may compromise temperature accuracy. Distribute samples
evenly and leave approximately 30% of rack space open for best results.
9. DO NOT place items on bottom surface of chamber
Operating unit with test samples
placed directly on bottom surface of
chamber may cause unit to perform
poorly. Likewise, chamber
temperature may become
excessive, causing malfunction or
damage. Always use the included
racks, supported on the standard
rack pegs, and avoid placing any
items on bottom surface. DO NOT
remove screws from bottom-most
rack.
10. Power loss recovery
In the event of a power loss, unit automatically reverts to status just before power loss and
begin operation once again from that point.
。
11. Stacking
When stacking units is required, use optional dedicated stacking hardware (maximum 2
units). Do not attempt to stack any unit directly on top of another.
12. Post-installation measures
In the event of earthquakes or other unforeseen incidents, unit may tip over or fall.
Implement appropriate safety measures to stabilize unit following installation.
DO NOT place items
on bottom surface!