41
14. SETUP CHECKLIST
*
Set unit up according to the following: (Confirm optional items or special specifications separately)
Model
Serial number
Date
Installed by
(company or personnel name)
Installation approved
by
Assessed
by
№
Item
Procedure
Instruction manual reference
Assessed
by
Specifications
1
Included Items
Confirm actual items against list of
included items.l
10. Specifications
– pg. 36
2
Installation
・
Visually check the surrounding area.
Caution: check for operational hazards.
2. Pre-operation Procedures
– pg. 5
Operation
1
Power voltage
・
Measure line voltage (power terminal or
outlet) with a voltmeter.
・
Measure line voltage during operation.
(must meet required rating).
Caution: Confirm outlet rating or breaker
power rating meets unit requirements.
2. Pre-operation Procedures
– pg. 7
10. Specifications
– pg. 36
2
Operation
・
Start operation.
BM: Add water, set the temperature to
50°C, and confirm stability.
BO: Add silicon oil, set temperature to
100°C, and confirm stability.
2. Pre-operation Procedures
– pg. 5
4. Operation Procedures
– pg. 15
5. Handling Precautions
– pg. 29
3
Stop
Operation
・
Stop operation.
BO: Notify surrounding personnel of
high oil temperature, and complete
installation.
4. Operation Procedures
– pg. 15
5. Handling Precautions
– pg. 29
Orientation
1
Operational
Descriptions
Explain unit operation as written in
instruction manual.
1.Safety Precautions ~
13. List of Hazardous Substances
pgs. 1~40
2
Error code
Explain function of each component as
written in instruction manual.
8. Troubleshooting ~
9.
Service & Repair
– pgs. 33~35
3
Maintenance
& Inspection
Explain of inspection and maintenance
procedure as written in instruction manual.
6. Maintenance Procedures
– pg. 31
4
Installation
Data Entry
Completion
・
Fill in installation date and name of
installing personnel or company on unit
“OK and Service Sticker”.
・
Explain how to contact technician.
9. Service & Repair
– pg. 35
Содержание BM500
Страница 2: ......