4-75
FRONT FORK
k. Set the cap bolt distance “c” to specifica-
tion.
l. Install the damper adjusting rod and cap
bolt, and then finger tighten the cap bolt.
WARNING
EWA13670
Always use a new cap bolt O-ring.
m. Hold the cap bolt “5” and tighten the locknut
“3” to specification.
n. Remove the rod holder and fork spring
compressor.
16.Install:
• Cap bolt
(to the outer tube)
TIP
• Temporarily tighten the cap bolt.
• When to tighten the cap bolt to the specified
torque is after installing the front fork leg to the
vehicle and tightening the lower bracket pinch
bolts.
EAS30210
INSTALLING THE FRONT FORK LEGS
The following procedure applies to both of the
front fork legs.
1. Install:
• Front fork leg
Temporarily tighten the upper and lower
bracket pinch bolts.
WARNING
EWA13680
Make sure the brake hoses are routed prop-
erly.
TIP
When installing the front fork, set the outer tube
with the specified length “a” from the top of the
outer tube to the top of the lower bracket.
2. Tighten:
• Lower bracket pinch bolt “1”
• Cap bolt “2”
• Upper bracket pinch bolt “3”
Distance “c”
1
3
mm (0.51 in)
Front fork cap bolt locknut
15 N·m (1.5 kgf·m, 11 lb·ft)
c
T
R
.
.
5
3
Installed length (from the top of
the outer tube) “a”
211.5 mm (8.
33
in)
Lower bracket pinch bolt
2
3
N·m (2.
3
kgf·m, 17 lb·ft)
Front fork cap bolt
2
3
N·m (2.
3
kgf·m, 17 lb·ft)
Upper bracket pinch bolt
26 N·m (2.6 kgf·m, 19 lb·ft)
a
T
R
.
.
T
R
.
.
T
R
.
.
Содержание XSR900 2022
Страница 1: ...2022 SERVICE MANUAL XSR 900 BEA 28197 E0 MTM890 ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 28: ...1 19 SPECIAL TOOLS ...
Страница 44: ...2 15 CABLE ROUTING Handlebar side view 6 7 8 10 9 8 7 1 2 3 6 5 4 A 5 C 9 10 11 12 2 1 3 D B ...
Страница 46: ...2 17 CABLE ROUTING Main switch left side view A 5 4 2 B 4 3 2 1 C 2 D 2 5 5 ...
Страница 64: ...2 35 CABLE ROUTING Front brake hose left side view 1 2 4 3 A 3 7 C 5 B 6 H 3 2 8 3 F F G G E E I D 2 8 3 J ...
Страница 68: ...2 39 CABLE ROUTING ABS ECU Electronic Control Unit top and left side view 7 8 4 A B 1 2 3 4 5 C D 5 8 E 9 7 6 ...
Страница 72: ...2 43 CABLE ROUTING Fuel tank left side view 1 2 3 4 5 6 A 1 7 C 4 5 B 4 D E 8 3 9 4 H 5 G 5 F ...
Страница 74: ...2 45 CABLE ROUTING Canister H D F F E 7 7 8 G D 2 A 1 B 3 4 B C D I 5 6 D 1 ...
Страница 78: ...2 49 CABLE ROUTING Radiator right side view H G F D C E 3 4 2 B A 1 ...
Страница 80: ...2 51 CABLE ROUTING Water pump left side view 3 4 2 A C D B F 1 E ...
Страница 84: ...2 55 CABLE ROUTING ...
Страница 118: ...3 32 PERIODIC MAINTENANCE ...
Страница 314: ...5 97 TRANSMISSION ...
Страница 316: ...6 1 COOLING SYSTEM DIAGRAMS EAS20299 COOLING SYSTEM DIAGRAMS 3 2 1 1 1 Water pump 2 Thermostat 3 Radiator ...
Страница 317: ...6 2 COOLING SYSTEM DIAGRAMS 1 2 3 4 5 1 Water jacket joint 2 Thermostat 3 Water pump 4 Oil cooler 5 Coolant reservoir ...
Страница 330: ...6 15 WATER PUMP ...
Страница 347: ......
Страница 353: ...8 6 IGNITION SYSTEM ...
Страница 359: ...8 12 ELECTRIC STARTING SYSTEM ...
Страница 361: ...8 14 CHARGING SYSTEM 1 AC magneto 2 Rectifier regulator 3 Fuse box 4 Main fuse 23 Battery 24 Engine ground ...
Страница 363: ...8 16 CHARGING SYSTEM ...
Страница 379: ...8 32 COOLING SYSTEM Replace the ECU Refer to REPLACING THE ECU En gine Control Unit on page 8 41 ...
Страница 383: ...8 36 FUEL PUMP SYSTEM Replace the ECU Refer to REPLACING THE ECU En gine Control Unit on page 8 41 ...
Страница 398: ...8 51 ELECTRICAL COMPONENTS ...
Страница 417: ...9 11 SYSTEM DIAGRAM ...
Страница 437: ...9 31 CRUISE CONTROL SYSTEM ...
Страница 723: ......
Страница 724: ......