7-11
Power unit assembly
k.
Install the water pressure sensor harness
“a” to the clamp “1”.
l.
Connect the trolling switch coupler “a” and
alert indicator coupler “b” (tiller handle
model).
m. Connect the shift position switch coupler
“c” and 6Y8 multifunction meter harness
coupler “d”.
n.
Install the each harness to the clamps “1”.
o.
Install the PTT motor leads “1” to the plas-
tic ties “2”, clamp “3”, and PTT relay “4”
(PTT model).
p.
Tighten the PTT motor lead bolts “5” to the
specified torque (PTT model).
q.
Install the caps “6” (PTT model).
r.
Install the battery cables “7”.
s.
Install the cover “1”.
t.
Connect the 10-pin coupler “a”, and then
fasten it to the cover “1” with a plastic tie
“2”.
u.
Install the main wire harness “3” to the
clamp “4”, and then fasten the main wire
harness “3” to the bracket “5” with a plastic
tie “6”.
TIP:
Before fastening the main wire harness “3” to
the clamp “4” and the bracket “5”, pull it to pre-
vent loosening.
1
a
1
1
a
b
c
d
PTT motor lead bolt “5”
4.0 N·m (0.40 kgf·m, 3.0 lb·ft)
1
2
3
4
5
6
7
T
R
.
.
1
2
3
4
5
6
a
Содержание F30A 2018
Страница 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Страница 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Страница 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Страница 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Страница 342: ...Jul 2018 ABE E ...