9-7
Tiller handle (tiller handle model)
q.
Connect the connectors “a” of the PTT
switch Red (R) lead, Sky blue (Sb) lead,
and Light green (Lg) lead (PTT model).
r.
Connect the connectors “a” of the neutral
switch Brown (Br) leads, and then install
the holders “1” and “2” and the bracket “3”.
s.
Install the shift cable “1”, throttle cable “2”,
clips “3”, and cable clamps “4”.
t.
Connect the alert indicator couplers “a”
and “b”, and then install the cover “1”.
u.
Install the grease nipple “2”, and then tight-
en it to the specified torque.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Lg
R
S
b
a
Br
a
1
1
2
2
3
A
1
1
4
2
4
4
2
3
3
3
Grease nipple “2”
3.0 N·m (0.30 kgf·m, 2.2 lb·ft)
b
a
1
2
T
R
.
.
Содержание F30A 2018
Страница 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Страница 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Страница 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Страница 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Страница 342: ...Jul 2018 ABE E ...