5-44
PTT system
PTT system
Checking the PTT relay
1.
Measure:
• PTT relay input voltage
Out of specification
Check the wire har-
ness for continuity.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Remove the caps.
b.
Measure the input voltage between the
PTT relay terminal “a” and terminal “b”.
c.
Install the caps.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
2.
Check:
• PTT relay continuity
Out of specification
Replace.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Disconnect the battery power source,
ground lead, PTT motor leads, and PTT
relay coupler.
Before disconnecting the PTT relay termi-
nals, make sure to disconnect the battery
negative terminal.
b.
Remove the PTT relay.
c.
Connect the special service tool “1”.
d.
Check the PTT relay for continuity.
e.
Connect the positive battery lead to the
terminal “a”, and the negative battery lead
to the terminal “b”, and then check the PTT
relay for continuity.
Input voltage
12 V
Terminal “a”–Terminal “b”
b
a
Test harness (2 pins) “1”
90890-06867
Test harness (2 pins) “1”
YB-06867
PTT relay continuity
“a”
“b”
“c”
“d”
“e”
“f”
PTT relay continuity
“b”
“c”
“d”
“e”
G/
W
G
Lg
S
b
1
e
f
d
c
a
b
G/
W
G
Lg
S
b
a
e
d
c
b
Содержание F30A 2018
Страница 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Страница 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Страница 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Страница 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Страница 342: ...Jul 2018 ABE E ...