3-4
Uncrating
i.
Lift up the outboard motor carefully along
with the bottom frame “1”.
Make sure that the lifting harnesses do not
damage any parts of the outboard motor.
j.
Remove the skeg holder “1”.
k.
Remove the bolts “1”.
l.
Remove the steering retainer, and then in-
stall a hydraulic steering cylinder or steer-
ing cable following the recommendation of
the manufacturer (remote control model).
m. For the procedure of outboard motor
mounting on boat, see “Rigging Guide”
(6YR-2819Y-**).
n.
Remove the lifting harness and shackles,
and then install the fiywheel magneto cov-
er and top cowling.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
1
1
1
Содержание F30A 2018
Страница 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Страница 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Страница 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Страница 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Страница 342: ...Jul 2018 ABE E ...