9-8
PTT switch and cowling lock lever
0
1
2
3
4
5
6
7
8
9
10
A
Removing the PTT switch
1.
Remove the holder
a
, and then remove
the PTT switch
b
. For checking the PTT
switch, see “Checking the PTT switch (on
bottom cowling)” (5-49).
A
Regular rotation model
B
Counter rotation model
Removing the cowling lock lever
1.
Remove the spring
a
.
2.
Remove the lever
b
and cowling lock
lever
c
.
Removing the flushing hose
1.
Remove the adapter
a
and hose joints
b
,
c
.
2.
Remove the flushing hose
d
, PTT motor
leads
a
, trim sensor lead
b
, and grom-
met
e
.
STBD
A
a
b
a
PORT
B
b
a
b
c
a
b
c
d
a
b
e
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......