5-26
Charging units and components
0
1
2
3
4
5
6
7
8
9
10
A
8.
Install the main relay
a
.
9.
Connect the engine ECM coupler
b
, and
then install the junction box cover.
10. Connect the high-pressure fuel pump
coupler
a
.
Charging units and components
Checking the lighting coil (stator
assembly)
1.
Disconnect the lighting coil coupler
a
,
and then connect the test harness (3
pins)
a
.
2.
Measure the lighting coil output peak
voltage between all combinations of the
terminals. Replace the lighting coil if
below specification.
3.
Measure the lighting coil resistance.
4.
Disconnect the test harness
a
, and then
connect the lighting coil coupler
a
.
Wiring harness continuity:
Terminal 1–Terminal
c
Terminal 2–Terminal 43
c
b
43
a
Test harness (3 pins)
a
:
90890-06847
Lighting coil output peak voltage:
Green (G)–Green (G)
r/min
Unloaded
Cranking
1500
3500
DC V
11.0
50.0
110.0
Lighting coil resistance
(reference data):
0.2–0.3
Ω
at 20 °C (68 °F)
a
a
a
G
G
G
Fuel control units and components / Charging units and components
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......