9-22
Oil pan and exhaust manifold
0
1
2
3
4
5
6
7
8
9
10
A
3.
Install a new gasket
h
, the exhaust
manifold
i
, rubber seal
j
, and then
tighten the exhaust manifold bolts
k
temporarily.
4.
Tighten the exhaust manifold bolts
k
first, and then tighten the oil pan bolts
g
to the specified torques.
5.
Install the rubber seal
l
and cooling
water pipe
m
.
6.
Install the dowels
n
, new gaskets
o
,
and the plate
p
, and then install the muf-
fler assembly
q
.
7.
Tighten the muffler assembly bolts
r
to
the specified torque.
Exhaust manifold bolt
k
:
20 N·m (2.0 kgf·m, 14.8 ft·lb)
Oil pan bolt
g
:
20 N·m (2.0 kgf·m, 14.8 ft·lb)
d
e
f
g
g
g
g
h
i
j
k
k
Muffler assembly bolt
r
:
20 N·m (2.0 kgf·m, 14.8 ft·lb)
l
m
n
n
o
o
q
r
p
r
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......