9-5
BRKT
Bracket unit
Installing the shift rod and shift
bracket
1.
Install the bushing
a
, and then install the
circlip
b
.
2.
Install the ball
c
, spring
d
, and bolt
e
,
and then tighten the bolt
e
to the
specified torque.
3.
Install the shift lever
f
to the set pin
a
of
the shift rod assembly
g
.
4.
Install the shift rod assembly
g
, and then
align the center of the set pin
a
with the
mark
b
on the bottom cowling.
5.
Install the shift bracket assembly
h
, and
then install the bushing
i
and clip
j
to
the shift lever
f
.
Bolt
e
: 18 N·m (1.8 kgf·m, 13.3 ft·lb)
a
c
b
e
d
a
a
b
f
g
h
i
j
f
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......