9-35
BRKT
Bracket unit
8.
Reverse the PTT motor leads between
the battery terminals to fully extend the
PTT rams, and then measure the
hydraulic pressure when the reading on
the pressure gauge stabilizes.
9.
Replace the special service tool
d
with
the special service tool
f
.
.
TIP:
Quickly change the special service tools
before any fluid flows out of the hole.
10. For checking the fluid level, proceed the
step 2–step 4 again.
11. Connect the PTT motor leads to the
battery terminals to fully retract the PTT
rams, and then measure the hydraulic
pressure when the reading on the
pressure gauge stabilizes.
12. Reverse the PTT motor leads between
the battery terminals to fully extend the
PTT rams.
Ram
PTT motor lead
Battery
terminal
Down
Black (B)
Black/White (B/W)
Hydraulic pressure (up) (reference
data): 9.8–11.8 MPa
(98.0–118.0 kgf/cm
2
, 1421.0–1711.0 psi)
Ram
PTT motor lead
Battery
terminal
Up
Black/White (B/W)
Black (B)
+
–
B
B/W
+
–
f
e
d
Hydraulic pressure gauge
e
:
90890-06776/06800
Down relief fitting
f
: 90890-06774
Hydraulic pressure (down)
(reference data): 5.9–8.8 MPa
(59.0–88.0 kgf/cm
2
, 855.5–1276.0 psi)
Ram
PTT motor lead
Battery
terminal
Down
Black (B)
Black/White (B/W)
B
B/W
+
–
B
B/W
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......