5-49
ELEC
Electrical system
7.
Connect the positive battery lead to the
terminal
f
, and the negative battery lead
to the terminal
b
, and then check the
PTT relay for continuity. Replace the PTT
relay if out of specification.
8.
Connect the PTT relay coupler, battery
power source, ground lead, and PTT
motor leads.
9.
Install the PTT relay and junction box
cover.
Checking the PTT switch (on bottom
cowling)
1.
Disconnect the PTT switch coupler
a
.
2.
Measure the input voltage between the
PTT switch coupler terminal and ground.
3.
Check the PTT switch for continuity.
Replace the PTT switch if out of specifi-
cation.
4.
Remove the junction box cover.
5.
Disconnect the PTT relay coupler
e
.
6.
Check the wiring harness for continuity.
PTT relay continuity:
a
b
c
d
G/W
G
Lg
Sb
c
a
d
b
a
f
e
a
R
PTT switch input voltage:
Red (R)–Ground
12.0 V (battery voltage)
Switch
position
Terminal
b
c
d
UP
Free
DN
Lg
R
Sb
c
d
b
e
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......