Commissioning
Alyza IQ PO4
74
ba76201d03
05/2020
install the replacement parts required.
As soon as the controller of the IQ S
ENSOR
N
ET
identifies the Alyza IQ, the chan-
nels of the Alyza IQ are displayed in the measured value display of the
IQ S
ENSOR
N
ET
. Alyza IQ
Before the first measurement, bars are displayed.
For the commissioning you have to know how to:
Open the measuring unit,
Install the MultiPort valve (
MPV
),
Install the ChemBag,
Install the tube at the MultiPort valve (
MPV
)
(if the functions
Untergr.-korr. (opt)
or
2-Punkt-Kalibrierung
are
configured)
Close the measuring unit.
Details on the individual steps are given in the present operating
manual of your Alyza IQ.
You can cancel and later continue the install wizard at any time.
When the Alyza menu is opened, the install wizard starts automati-
cally until a first valid configuration of the Alyza IQ is available.
The install wizard does no longer automatically start once the parts
required have been installed.
figure 3-33Measured value display of the Alyza IQ (example: 2-channel instrument)
1
Highlight the measured value display of the Alyza IQ.
2
Open the Alyza menu with
<C>
.
On initial commissioning, the install wizard of the Alyza IQ opens auto-
matically.