Commissioning
Alyza IQ PO4
60
ba76201d03
05/2020
Scope of delivery
of the collection
funnel of the
Alyza IQ
Collection funnel
Rubber cover for collection funnel
3 plugs for the openings of the rubber cover
2 sample overflow tubes (from the overflow vessel to the collection funnel)
Cable ties to fasten the collection funnel to the fixing bracket.
Preparatory
activities
When operating heat tracing lines for the return lines:
Install the heat tracing first (see chapter section 3.3.13 Connecting the power
cable and heat tracing lines,
It is possible to dispose of the sample overflow and chemical waste
from the measuring unit separately by using a second collection fun-
nel (accessory WF Set). The second collection funnel is installed at
the front cable gland. There the sample return is transported out of
the housing separately (see section 3.3.15 Mounting the WF Set
(collection funnel for sample overflow),
Install the collection funnel together with the heat tracing lines. If the
mounting plate is removed, there is more room to install the collec-
tion funnel.
Содержание WTW Alyza IQ PO4
Страница 171: ......