Alyza IQ PO4
Commissioning
75
ba76201d03
05/2020
3
Put on your personal protective equipment (PPE) and chemical resis-
tant gloves (see section 2.4 Personal protective equipment (PPE),
24).
WARNING
Dangerous chemicals.
Improper use of chemicals can cause damage to your
health.
Heed the following rules:
Read the labels of the ChemBags and follow the safety
instructions
Wear protective equipment (lab coat, protective gog-
gles, chemical resistant protective gloves, safety
shoes)
4
Open the outer housing door far enough so the arrestable brake-stay
(on the lower right side of the housing) catches.
5
Open the inner housing door far enough so that it touches the outer
door. Tilt the angular sheet (at the inside of the outer door) over the
upper edge of the inside door.
6
Remove the front cover of the measuring unit.
Using one hand, grip the handle at the upper edge of the front cover
of the measuring unit.
Pull the front cover of the measuring unit somewhat to the front
against the resistance.
Carefully take the front cover out to the front and put it in a clean
place.
7
Start the install wizard.
8
Follow the instructions of the install wizard.
Step 1:
Configure all settings requiring the installation of replacement parts
(ChemBags, tubes). From them, the install wizard makes a list of the
replacement parts required.
Step 2:
Install the replacement parts required (MultiPort valve, tube, Chem-
Bags).
Details on installing the replacement parts (see section 5.5 Installing
/ exchanging the ChemBags, MPV, tubes,
For each of the functions 2-point calibration and background correc-
tion (optimized), an extra tube has to be installed.
Содержание WTW Alyza IQ PO4
Страница 171: ......