53 | UM-PP-EN-03
1.
Install the inner bearing block.
2.
Remove the outer bearing block and pull drive belt out from under the block.
3.
Position the drive belt in the front shaft pulley, checking that the teeth engage correctly.
Replace the screw and all other parts.
4.
Using a rod or C-clamp, pull the front shaft to tighten the running belt. Measure the clearance
between the running surfaces and adjust the value measured and noted previously. This should
be approx. 8” (20.5 cm).
5.
Tighten the bearing block screws to approx. 50 ft-lbs.
6.
Check that the drive belt runs correctly in both pulleys and can be moved easily in the middle
by a width of 1 - 2 fingers.
7.
Move the running surface by hand and ensure that it runs smoothly and is not blocked
anywhere.
8.
Turn the treadmill ON and let it run at various speeds. If any unusual vibrations or noises occur,
switch the treadmill OFF and check the dimensions. If noises and/or vibrations persist, contact
the WOODWAY Service Center or your local representative.
9.
Replace the outer covers.
Содержание ST PPS 43 Med
Страница 22: ...16 UM PP EN 03 2 7 EC Declaration of Conformity Fig 1 EC Declaration of Conformity...
Страница 26: ...20 UM PP EN 03 3 5 Dimensions Fig 3 Device dimensions PPS Bari Mill 43 Fig 4 Device dimensions PPS Bari Mill 55...
Страница 27: ...21 UM PP EN 03 Fig 5 Device dimensions PPS Bari Mill 70 Fig 6 Device dimensions PPS Med 43...
Страница 114: ...108 UM PP EN 03 12 Maintenance Report DATE MAINTENANCE MEASURES FROM REMARKS...