51 | UM-PP-EN-03
Fig. 28 Fixing screws in railing mount, PPS Bari-Mill
Mounting the Railing
1.
Mounting of the railing is carried out in the opposite order.
2.
The following points must be checked during mounting:
•
Are all cables in good condition?
•
Are all bolts tight?
•
Have any other plugs been accidentally pulled out?
•
Are all plugs properly inserted and screwed tight?
•
Are the wires fixed to the treadmill frame with wire ties?
3.
Mount the side panels. Check the distance (gap) between the panel and the walking surface
belt. The panel must not come into contact with the walking surface. Permissible gap size is
1/8” to 3/16” (
3 to 5 mm). Sizes greater than 5 mm are not allowed for safety reasons. Let the
treadmill run at about 0.4 MPH (0.5 km/h) and check the clearances for at least one full
revolution. The walking surface belt play must not exceed
1/16” (
2mm).
4.
Perform a function test. Special attention must be paid to the safety equipment.
6.5.5
Transportation Notes
The railing can be further disassembled using an Allen wrench. For this loosen the individual railing
mounting brackets. Ensure that the wires inside the device are not damaged during disassembly.
When transporting the railings, the cables must be adequately protected. Now the treadmill can be
transported vertically. Always follow the safety instructions in this section exactly.
Содержание ST PPS 43 Med
Страница 22: ...16 UM PP EN 03 2 7 EC Declaration of Conformity Fig 1 EC Declaration of Conformity...
Страница 26: ...20 UM PP EN 03 3 5 Dimensions Fig 3 Device dimensions PPS Bari Mill 43 Fig 4 Device dimensions PPS Bari Mill 55...
Страница 27: ...21 UM PP EN 03 Fig 5 Device dimensions PPS Bari Mill 70 Fig 6 Device dimensions PPS Med 43...
Страница 114: ...108 UM PP EN 03 12 Maintenance Report DATE MAINTENANCE MEASURES FROM REMARKS...