
Maintenance
Up/Down System
4
4-5
15doc101509
Maintenance
2.
Lubricate the up/down acme screw with a rolling bearing lubricant (e.g.
Ł
T4S or Shell Extreme Pressure
Grease) every six months. Apply the lubricant to the grease fitting in the nut housing. Lubrication may be
required sooner if environmental conditions require it. If the lubricant appears to have dispersed or is dry or
crusted, reduce the maintaince interval.
The up/down screw bellows should completely cover the screw. If either of the bellows is damaged, replace
it immediately. Before installing the new bellows, clean the up/down screw and nut thoroughly with extraction
naphtha. The acme screw nut (Part No. 094243) should be replaced if the end play is larger than 1.25 mm.
3.
Check the up/down belt tension after the first 20 hours of operation and every 100 hours thereafter.
See Figure 4-4.
Unbolt the up/down top guard. Loosen the motor mounting bolts. Use the
adjustment bolt shown below to adjust the belt tension. Tighten the motor mounting bolts. Replace
the top guard.
FIG. 4-4
100
Motor Mounting
Bolts
Adjustment Bolt
Force=25
Deflection=
5mm
Содержание LT15 M2 E11S
Страница 1: ...Table of Contents Section Page Table of Contents SW 07doc1207091...
Страница 2: ......
Страница 6: ...6 15doc120709...
Страница 28: ...SAWMILL ASSEMBLY Unpacking the Sawmill 2 2 8 15doc120709 SAWMILL ASSEMBLY See Figure 2 1 FIG 2 1 500kg...