
Setup & Operation
Water Lube Operation
3
3-25
15doc120709
Setup & Operation
3.14 Water Lube Operation
The Water Lube System keeps the blade clean. Water flows from a 5-gallon (18.9 liter) bottle through
a hose to the blade guide where the blade enters the log. A valve in the bottle cap controls the
amount of water flow.
See Figure 3-5.
Install the water bottle at the top of the vertical mast.
See Figure 3-6.
Route the water hose as shown below. Secure it with the provided hose clamps at the
FIG. 3-5
Place water bottle on tray
Содержание LT15 M2 E11S
Страница 1: ...Table of Contents Section Page Table of Contents SW 07doc1207091...
Страница 2: ......
Страница 6: ...6 15doc120709...
Страница 28: ...SAWMILL ASSEMBLY Unpacking the Sawmill 2 2 8 15doc120709 SAWMILL ASSEMBLY See Figure 2 1 FIG 2 1 500kg...