Setup & Operation
Sawmill Setup
3
3-1
15doc120709
Setup & Operation
SECTION 3 SETUP & OPERATION
3.1
Sawmill Setup
IMPORTANT!
Before starting to use the sawmill you have to meet
the following conditions:
Set up the sawmill on firm and level ground.
The sawmill can be operated with the sawdust collection system only.
The sawmill can be operated under roof only.
The sawmill can be operated in temperature range from -15
o
C to 40
o
C only.
Illuminance at operator's position must be 300lx.
The sawmill operator’s position is shown below.
Have a qualified electrician install the power supply (according to EN 60204 Standard).
The power supply must meet the specifications given in the table below.
IMPORTANT!
When starting the machine for the first time, check
that main motor rotation direction is as indicated by the arrow located
on the motor body (fan guard). If the rotation direction is incorrect,
invert the phases in the phase inverter in the power socket (electric
box). Setting the phases in the phase inverter correctly will ensure
correct rotation directions of all sawmill motors.
3-Phase
Volts
Fuse disconnect
Suggested Wire Size
400 VAC
16 A
2,5 mm
2
to 15m length
TABLE 3-0
!
!
Содержание LT15 M2 E11S
Страница 1: ...Table of Contents Section Page Table of Contents SW 07doc1207091...
Страница 2: ......
Страница 6: ...6 15doc120709...
Страница 28: ...SAWMILL ASSEMBLY Unpacking the Sawmill 2 2 8 15doc120709 SAWMILL ASSEMBLY See Figure 2 1 FIG 2 1 500kg...