Operation
Are the machine and the object to be coated correctly grounded
(see section 4.3.2 on page 33)?
Check the release agent level in the pump and top it off if necessary
(see section 6.4.1 on page 49).
Flush the machine (see section 5.3 on page 38) in order to flush out
the factory-made test substance (during initial commissioning) or
the remains of the previous processing material. Use the flushing
agent recommended by the manufacturer of your coating material.
During flushing, check that all machine parts are leak-tight and
tighten the connections if necessary.
5.2 Spraying
Before spraying, the work steps for commissioning must have been
performed (see chap. ‘Putting the machine into operation’ on page ).
1. Put the suction into the spraying material.
2. Open the compressed air shut-off valve.
3. Adjust the air inlet pressure such that the
pump runs slowly.
4. Unlock the spray gun and trigger it until
the spraying material runs out clean and
free of bubbles. Pump and hoses are
now completely filled with material.
5. Let go of the gun trigger and lock the spray
gun. The pump should stop when the trig-
ger is released.
Fig. 17:
Compressed air
regulator with compressed
air shut-off valve and pres-
sure gauge
6. Close the compressed air shut-off valve.
7. Relieve the pressure in the machine (see ‘Relieving the pressure’
on page ).
36
Original Operation Manual
✓
, Status:
2021/07/23
1alpg_BA_en_bb-0550010
Содержание PHOENIX GX Series
Страница 1: ...1alpg_BA_en_bb 0550010 PHOENIX GX SERIES Operation Manual 1K Airless AirCombi Serial No...
Страница 4: ......
Страница 69: ...Technical Information Original Operation Manual Status 2021 07 23 1alpg_BA_en_bb 0550010 63...
Страница 70: ...Technical Information 64 Original Operation Manual Status 2021 07 23 1alpg_BA_en_bb 0550010...
Страница 71: ...Technical Information Original Operation Manual Status 2021 07 23 1alpg_BA_en_bb 0550010 65...