Maintenance
6.2 Maintenance schedule
The information in the maintenance schedule constitutes recom-
mendations only. The time frames may vary depending on the
characteristics of the materials used, as well as external influences.
Time frame
Activity
for further reading
Prior to each com-
missioning
Check the release
agent level of the
high pressure
pump, fill release
agent if necessary
page 50
Once per week
Visual inspection of
the compressed air
and material hoses
section 6.6 on page
Every 50 operating
hours
Check the high
pressure pump
release agent for
material residues
page 7
Every 3 years
Have the
compressed air and
material hoses
checked by a
specialist and
replace if
necessary
section 6.6 on page
6.3 Safety valve
6.3.1 Checking the safety valve
Only perform the function test with a filled pump!
Original Operation Manual
✓
, Status:
2021/07/23
1alpg_BA_en_bb-0550010
47
Содержание PHOENIX GX Series
Страница 1: ...1alpg_BA_en_bb 0550010 PHOENIX GX SERIES Operation Manual 1K Airless AirCombi Serial No...
Страница 4: ......
Страница 69: ...Technical Information Original Operation Manual Status 2021 07 23 1alpg_BA_en_bb 0550010 63...
Страница 70: ...Technical Information 64 Original Operation Manual Status 2021 07 23 1alpg_BA_en_bb 0550010...
Страница 71: ...Technical Information Original Operation Manual Status 2021 07 23 1alpg_BA_en_bb 0550010 65...