WILO SE 02/2017 V4.1WE
cooling can no longer be guaranteed. This would lead
to increased wear on the hydraulics. To prevent this, a
water guide shroud should be used when necessary, or
the product should be installed next to blind pipes.
Installation with flanged pipes
Use hoisting gear with sufficient lifting capacity. Place
two pieces of square timber across the well. The sup-
port clamp will later be placed on them, so they should
have sufficient bearing capacity. If the well opening is
narrow, a centering apparatus must be used, since the
product may not touch the sides of the well.
1 Place the submersible motor pump vertically and
secure it from falling over or slipping.
2 Attach the mounting brackets to the flange of the ris-
ing pipe, hang them on to the lifting gear and lift out
the first pipe.
3 Fasten the free end of the rising pipe to the discharge
port of the submersible motor pump. A seal must be
placed between the connections. Always insert the
bolts from below, so that the nuts can be screwed on
from above. Also, always tighten the bolts in a cross
pattern to avoid pressure on the seal from one side.
4 Fasten the cable with a cable clip slightly above the
flange. If the drilled hole is narrow, the flanges of the
rising pipes must be have notches for the cables to
pass through.
5 Lift up the unit with the pipe, move it over the well and
lower it until the support clamp on the rising pipe can
be loosely connected. When doing this, make sure that
the cable remains outside the support clamp, so that it
does not get squeezed.
6 Then let the support clamp rest on the pieces of
square timber that you put in beforehand. The system
can now be lowered further until the upper pipe flange
rests on the attached support clamp.
7 Remove the mounting bracket from the flange and
attach it to the next pipe. Lift up the rising pipe, move
it over the well and flange-bolt the free end to the ris-
ing pipe. Place another seal between the connections.
8 Remove the support clamp, then fasten the cable
slightly above and below the flange with a cable clip.
For heavy, large-diameter cables, it is advisable to
attach a cable clip every 2 to 3 meters. If several cables
are used, each must be fastened separately.
9 Lower the rising pipe so that the flange is in the well,
put the support clamp back on and lower the rising
pipe until the next flange touches the support clamp.
Repeat steps 7 to 9 until the rising pipe reaches the
required depth.
10 On the last flange, remove the mounting bracket and
attach the well cover.
11 Attach the lifting gear to the well cover and raise it
slightly. Remove the support clamp, feed the cable out
through the well cover and lower the cover on to the
well.
12 Bolt the well cover fast.
Installation with threaded connections
The procedure is almost the same as for installation
with flanged pipes. However, please note the follow-
ing:
1 The pipes are joined by means of threaded connec-
tions. The threaded pipes must be screwed tight to
each other without leaks. This means the pipe ends
must be wound with oakum or Teflon tape.
2 When screwing the pipes together, make sure that
they are in line, so that the thread is not damaged.
3 Note the direction of rotation on the unit. Use a pipe
with the correct thread (right or left-handed) so that
the pipe cannot become unscrewed by accident.
4 The threaded pipe must be secured against accidental
loosening.
5 The support clamp required during installation must
always be
firmly
mounted directly below the pipe con-
nection bell. Tighten the screws evenly until the clamp
is firmly touching the pipeline (the arms of the sup-
port clamp may not touch each other).
5.4.3 Horizontal installation
Fig. 3:
Installation
This installation type is only permitted when used
together with a cooling jacket. The unit is installed
directly in the water tank/reservoir/container and
flanged onto the discharge pipe. The cooling jacket
supports must be mounted at the distances specified
to prevent the unit from distorting.
The connected pipeline must be self-supporting,
i.e. it may not be supported by the product.
When installed horizontally, the pipe and unit are
mounted separately. Make sure that the discharge port
of the unit and the pipeline are level.
On this type of installation, the product must be
installed with a cooling jacket.
1 Drill the fastening holes for the supports on the floor
of the operating area (container/reservoir). You will
find specifications for the anchor bolts, distances
between holes and their sizes in the corresponding
instructions. Make certain that the screws and plugs
are sufficiently stable.
2 Fasten the supports to the floor and bring the product
into the correct position using a suitable hoisting gear.
3 Fasten the product to the supports using the supplied
fastening materials. Ensure that the type plate points
upwards!
4 Once the unit is firmly mounted, you can install the
piping system or flange-connect a piping system
Beware of serious crush injuries!
After the support clamp is removed, the hoist-
ing gear bears the entire weight of the system
and the pipe sags. This can lead to serious crush
injuries! Before removing the support clamp,
ensure that the holding cable in the hoisting
gear is taut!
1
Unit
7
Operating area
2
Discharge pipe
8
Water tank
3
Pressure vessel
9
Intake
4
Cooling jacket
10
Intake filter
5
Minimum water level
11
Dry-run protection
6
Level sensors
Содержание Sub TWU 3 P&P Series
Страница 2: ...Fig 1 Fig 2 1 2 3 4 5 0 30 1 00 m min 0 20 m 1 2 2 3 4 5 6 7 8 9 10 11 12 13 2 5 11...
Страница 4: ......
Страница 6: ......
Страница 245: ...Wilo Sub TWU 3 TWU 3 P P 245 1 1 1 1 2 2 1 3 1 4 1 4 1 1 5 1 6 1 7...
Страница 246: ...246 WILO SE 02 2017 V4 1WE 1 7 1 1 7 2 12 18 1 7 3 1 7 4 1 7 5 1 7 6 2 2 1 2 1 1...
Страница 247: ...Wilo Sub TWU 3 TWU 3 P P 247 2 1 2 DIN ANSI 2 2...
Страница 248: ...248 WILO SE 02 2017 V4 1WE 2 3 VDE 2 4 CE 2 5 VDE 0100 2 6 2 7 IP 68 2 8 PT100...
Страница 249: ...Wilo Sub TWU 3 TWU 3 P P 249 2 9 2 10 2 11 70 A 110 A 3 3 1 3 2 85 A...
Страница 250: ...250 WILO SE 02 2017 V4 1WE 3 3 1 15 C 5 C 25 C 3 4 6...
Страница 253: ...Wilo Sub TWU 3 TWU 3 P P 253 5 5 1 5 2 5 3 5 4...
Страница 254: ...254 WILO SE 02 2017 V4 1WE Wilo 5 4 1 15 C 1 5 4 2 2 1 2 3 4 1 8 2 9 3 10 4 11 5 12 6 13 7...
Страница 255: ...Wilo Sub TWU 3 TWU 3 P P 255 5 6 7 8 2 3 9 7 9 10 11 12 1 2 3 4 5 5 4 3 3 1 2 3 4 5 1 7 2 8 3 9 4 10 5 11 6...
Страница 258: ...258 WILO SE 02 2017 V4 1WE 0 30 1 30 3 55 70 30 50 10 0 30 2 60 1000 500 400 IP 6 6 1 VDE...
Страница 260: ...260 WILO SE 02 2017 V4 1WE 1 2 1 2 0 3 6 5 IP 6 5 1 5 6 5 2 6 6...
Страница 261: ...Wilo Sub TWU 3 TWU 3 P P 261 5 2 5 1 7 7 1 3 C 5 7 2 7 2 1 40 C...
Страница 263: ...Wilo Sub TWU 3 TWU 3 P P 263 75 439 5a 5b AbfG 524 02 91 689 8 1 8 2 8 2 1 8 3 8 3 1 1000...
Страница 264: ...264 WILO SE 02 2017 V4 1WE 20 2 8 3 2 9 9 0 1 1 2 9 0 2 1 2 3 2 4 3 5 2 6 7 9 0 3 1 2 3 4 5 9 0 4 1 2 3 4...
Страница 265: ...Wilo Sub TWU 3 TWU 3 P P 265 2 5 6 7 8 9 10 2 11 9 0 5 1 2 3 4 5 2 6 2 7 8 9 9 0 6 10...
Страница 301: ...Wilo Sub TWU 3 TWU 3 P P 301 1 1 1 1 2 2 1 3 1 4 1 4 1 1 4 2 1 5 1 6 1 7 1 7 1 a...
Страница 302: ...302 WILO SE 02 2017 V4 1WE 1 7 2 12 18 1 7 3 1 7 4 1 7 5 1 7 6 2 2 1 2 1 1 2 1 2...
Страница 303: ...Wilo Sub TWU 3 TWU 3 P P 303 DIN ANSI 2 2 2 3 VDE 2 4 CE...
Страница 304: ...304 WILO SE 02 2017 V4 1WE 2 5 VDE 0100 2 6 E RCD 2 7 IP 68 2 8 100 2 9...
Страница 305: ...Wilo Sub TWU 3 TWU 3 P P 305 2 10 2 11 kW 70 dB A 110 dB A 3 3 1 3 2 3 3 1 85 dB A...
Страница 306: ...306 WILO SE 02 2017 V4 1WE 15 C 5 C 25 C 3 C 4 6 3 4 4 4 1 4 1 1 DIN VDE 0100 702 46...
Страница 309: ...Wilo Sub TWU 3 TWU 3 P P 309 5 4 Wilo 5 4 1 15 C 1 5 4 2 2 1 8 2 9 3 10 4 11 5 12 6 13 7...
Страница 310: ...310 WILO SE 02 2017 V4 1WE 1 2 3 4 5 6 7 8 2 3 9 7 9 10 11 12 1 2 3 4 5...
Страница 315: ...Wilo Sub TWU 3 TWU 3 P P 315 5 1 2 1 2 0 3 bar 6 5 IP 6 5 1 5 1 2...
Страница 316: ...316 WILO SE 02 2017 V4 1WE 6 5 2 6 6 5 2 5 1 7 7 1 3 C 5 7 2...
Страница 318: ...318 WILO SE 02 2017 V4 1WE Wilo 75 439 5a 5b AbfG 524 02 91 689 8 1 8 2 8 2 1 8 3 8 3 1 1000 V...
Страница 319: ...Wilo Sub TWU 3 TWU 3 P P 319 20 M 2 M 8 3 2 9 9 0 1 1 2 9 0 2 1 2 3 4 5 6 7 9 0 3 1 2 3 4 5 9 0 4 1 2 3 4 5...
Страница 320: ...320 WILO SE 02 2017 V4 1WE 6 7 8 9 10 11 9 0 5 1 2 3 4 5 6 7 8 9 9 0 6 10...
Страница 340: ...340 WILO SE 02 2017 V4 1WE 1 1 1 1 2 2 1 3 1 4 1 4 1 1 4 2 1 5 1 6 1 7...
Страница 341: ...I Wilo Sub TWU 3 TWU 3 P P 341 1 7 1 1 7 2 12 18 1 7 3 1 7 4 1 7 5 1 7 6 2 2 1 2 1 1 2 1 2...
Страница 342: ...342 WILO SE 02 2017 V4 1WE DIN ANSI 2 2 2 3...
Страница 343: ...I Wilo Sub TWU 3 TWU 3 P P 343 VDE 2 4 CE CE 2 5 VDE 0100 2 6 RCD 2 7 IP 68 2 8 PT100 2 9...
Страница 344: ...344 WILO SE 02 2017 V4 1WE 2 10 2 11 70 110 A 3 3 1 3 2 85 A...
Страница 345: ...I Wilo Sub TWU 3 TWU 3 P P 345 3 3 1 15 C 5 C 25 C 3 C 4 6 3 4 4 4 1...
Страница 348: ...348 WILO SE 02 2017 V4 1WE 5 2 5 3 5 4 Wilo 5 4 1 15 C 1...
Страница 349: ...I Wilo Sub TWU 3 TWU 3 P P 349 5 4 2 2 1 2 3 4 5 6 7 8 2 3 9 7 9 10 11 12 1 2 3 1 8 2 9 3 10 4 11 5 12 6 13 7...
Страница 351: ...I Wilo Sub TWU 3 TWU 3 P P 351 5 5 5 5 1 5 6 RCD 5 6 1 10 A 4x1 5 5 6 2 L N 5 6 3 5 6 4 Plug Pump RCD 30 4 U V W PE...
Страница 354: ...354 WILO SE 02 2017 V4 1WE 0 3 5 1 2 1 2 0 3 6 5 IP 6 5 1 5 1 2...
Страница 355: ...I Wilo Sub TWU 3 TWU 3 P P 355 6 5 2 6 6 5 2 5 1 7 7 1 3 C 5 7 2...
Страница 358: ...358 WILO SE 02 2017 V4 1WE 20 2 8 3 2 9 9 0 1 1 2 9 0 2 1 2 3 2 4 3 5 2 6 7 9 0 3 1 2 3 4 5 9 0 4 1 2 3 4 2...
Страница 359: ...I Wilo Sub TWU 3 TWU 3 P P 359 5 6 7 8 9 10 2 11 9 0 5 1 2 3 4 5 2 6 2 7 8 9 9 0 6 10...
Страница 360: ...3LRQHHULQJ IRU RX 2 6 1RUWNLUFKHQVWUD H RUWPXQG HUPDQ 7 ZLOR ZLOR FRP ZZZ ZLOR FRP...