Net
User Manual 7.1 (2019-04) 30
Subject to change
OPC UA server software for data communication with Wildebo-
er-Net via on-site OPC clients.
........ pc. of WiNet-OPC-01
deliver: ........
Manufacturer: WILDEBOER
install:
........ ........
Subnet controller for initialising and operating up to four
subnets for at total of 128 field modules. Mains connection
230 V AC with standard Europlug and 1.5 m connecting line.
Galvanically isolated bus connections. Ethernet connection
with integrated 2-way switch for connection of the operating
unit, for upgrading the system with further subnet control-
lers and connecting a building control system via gateway.
Bus and Ethernet connections with plug-in screw terminals.
LEDs for diagnostics. Plastic casing IP40.
........ pc. of BS2-SC-01
deliver: ........
Manufacturer: WILDEBOER
install:
........ ........
Volume flow and pressure controller module for connection of
up to four electronic volume flow and/or pressure control-
lers (manufacturer WILDEBOER). 24 V DC voltage supply for
controllers via integrated power unit. Communication between
the module and controllers via RS485 or MP-Bus. Connection
of the controllers using spring terminals. Mains connection
230 V AC with standard Europlug and 1.5 m connecting line.
Galvanically isolated bus connections with plug-in screw
terminals. LEDs for diagnostics. Plastic casing IP40.
........ pc. of BS2-VR-01
deliver: ........
Manufacturer: WILDEBOER
install:
........ ........
Motor modules for up to two fire dampers and/or smoke pro-
tection dampers with a 24 V DC electric spring return actu-
ator, integrated limit switches for OPEN/CLOSED operating
positions and with thermo-electric release for fire dampers.
Mains connection 230 V AC with standard Europlug and 1.5 m
connecting line. Galvanically isolated bus connections with
plug-in screw terminals. Manual operation of connected damp-
ers using push-buttons, LEDs for diagnostics. The dampers
can also be operated using the modules without previously
commissioning the overall system, including carrying out
functional checks with logging of results. Plastic casing
IP40.
........ pc. BS2-MO-01 with AMP connector
deliver: ........
for both dampers
install:
........ ........
........ pc. of BS2-MO-02 with plug-in screw terminals
deliver: ........
for both dampers
install: ........
........
........ pc. BS2-MO-03 with AMP connector and
deliver: ........
plug-in screw terminals
install: ........
........
Wildeboer-Net
Specification text (4)