background image

Net

User Manual 7.1 (2019-04) 3

Subject to change

Wildeboer-Net

Product description

The 

Wildeboer-Net 

is a system for meeting the control requirements for energy efficiency, fire protection and oper-

ational reliability and safety of a ventilation and air conditioning system.

High-performance topology and convenience values guarantee the best possible effectivity and synergy at all stages 

of engineering and operation. 

Fire protection

The Wildeboer-Net upgrades fire protection in ventilation systems with easily parametrisable release groups 

(

 

see page 12)

 for fire dampers, smoke protection dampers, and volume flow and pressure controllers. Input/output 

modules can be used to integrate fire detections (smoke detections) into the release groups. This way, the building 

can be reliably sealed off internally at the early stage of a fire to provide effective protection from the transfer of cold 

smoke gases.  

⇒ 

see page 2 (spread of fire)

Operational reliability and safety

Wildeboer-Net upgrades the tried-and-tested operational reliability and safety of maintenance-free fire dampers with 

easily parametrisable functional checks 

(

⇒ 

see page 10)

. The functional check can be carried out individually, in groups 

or for all dampers simultaneously. The time requirement is the same regardless of the number of fire dampers. Breaks 

in operation and influences on operation are thus reduced to a minimum. As a result, functional checks can be carried 

out at shorter intervals, and thus considerably increase the operational reliability and safety of the system. The results 

of the functional checks are permanently stored, and can be exported. A graphic trend analysis of the results allow 
you to detect weaknesses in good time.  

⇒ 

see page 2 (MVV-TB)

Energy efficiency

Wildeboer-Net improves the energy efficiency of a ventilation and air conditioning system. Parametrisable calendar 

controls 

(

⇒ 

see page 14)

 can be used to define the supply air and exhaust air volume flow rates of connected volume 

flow and pressure controllers with a timer function. Sequence controls 

(

⇒ 

see page 13)

 can also be used to make require-

ment-based settings by integrating presence sensors and CO2 switches. The connected controllers can be overridden 

by integrating window contacts so that they close as soon as a window is opened, for instance. The reduction in the 

mean outdoor air volume flow rate of the system according to DIN V 18599 which is achievable as a result, makes 

for a reduction in the required energy. Monitoring functions facilitate the graphic analysis of the ventilation ratios in 
the system. Adjustments can be made at any time from a central point.  

⇒ 

see page 2 (EnEV)

Effectivity in engineering and operation

All the functionalities in Wildeboer-Net are parametrisable using the Wildeboer-Net software. Programming is not 

required. Integrated assistants make individual processes easier. All the parameters of volume flow and pressure 

controllers available for pre-order in the factory are automatically applied. All the devices are detected and addressed 

automatically during commissioning. High-performance topological characteristics, graphic analysis tools and the 

option of integrating building layouts make planning, commissioning and operation of the system easier. The system 

can be expanded or modified at any time without the need for programming.

Содержание BS2-BZ-01

Страница 1: ...Net User Manual 7 1 2019 04 1 The German original version of this document shall prevail Communication system Wildeboer Net Modules for volume flow pressure controller user s signalling units NEW...

Страница 2: ...s the use of fully maintenance free fire dampers The functional check of the fire dampers is the responsibility of the owner of the ventilation system Note The local inspection by a specialist inspect...

Страница 3: ...e functional checks are permanently stored and can be exported A graphic trend analysis of the results allow you to detect weaknesses in good time see page 2 MVV TB Energy efficiency Wildeboer Net imp...

Страница 4: ...3 Sub network 2 Cable length per sub network up to 3 200m Cable length in total per subnet controller 12 800m Cable length up to 100m Cable length up to 100m between modules Cable length up to 100m Ca...

Страница 5: ...can be forwarded via an OPC UA server The connected periphery is supplied with 24 V DC of power from the motor IO and volume flow and pressure controller modules Field modules and subnet controllers p...

Страница 6: ...to four subnets and for data exchange with the higher management level via Ethernet see page 16 Field level BS2 VR 01 volume flow and pressure controller module for connection of up to four elec troni...

Страница 7: ...If fire dampers are connected the fusible link can be pulled off or the test button on the motor can be actuated to trigger the desired fault message The fire dampers must be in the OPEN position for...

Страница 8: ...nt max 30 characters GIS code 1 Module VC 310 technology 375 01 M 431 102 K00 0120 2 Motor 1 VC 311 fire damper supply air 375 01 M 431 102 G053 0023 S 01 3 Motor 2 VC 311 fire damper exhaust air 375...

Страница 9: ...lled shut off of the fan If this is not possible and if there is a risk of damage to the duct network due to the fan running down and the fire dampers closing on site measures must be taken to prevent...

Страница 10: ...started functional checks the fan enabling function see page 9 using an optional I O module should definitely be used to shut off the fan Scheduled functional checks are monitored to make sure that t...

Страница 11: ...s been signalled via an input of the I O module to confirm that the fan has been shut off The mechanism is valid for non scheduled and scheduled manually started functional checks The fan has to be sh...

Страница 12: ...must receive what is referred to as a heart beat signal sign of life from every other field module within a certain time interval If this heart beat signal is not received for a longer period the devi...

Страница 13: ...editor can be used to read out and display the generated sequence controls Sequence controls can be created separately for each field module The status data from the respective field module and the st...

Страница 14: ...defined points in time or at fixed intervals For example motor modules or the FKKUE 03 control unit for FK90 fire damper for commercial kitchens can be used to close the connected fire and smoke prote...

Страница 15: ...s an example with a master slave function Graphic analysis The Wildeboer Net software also provides graphic analyses which allow you to detect trends simply They can be used for example to display res...

Страница 16: ...a gateway with higher level building control systems During commissioning the field modules connected to the subnets are detected and addressed automatically Four galvanically isolated CAN BUS connect...

Страница 17: ...the connected controllers from the volume flow and pressure controller module Existing VRE1 or VKE1 volume flow controllers can be connected via SM 01 interface modules Connected controllers are dete...

Страница 18: ...rs have to close when a particular one is closed and if fans have to be switched off All actuations and functions are remote controlled or controlled using the motor module s push buttons Fire dampers...

Страница 19: ...s Plug in screw terminals for the duct connection 3 1 M 24 V DC GND 1 2 3 5 6 7 8 Motor module BS2 MO 03 2 7 5 Motor connection using screw terminals 7 6 Limit switch connection using screw terminals...

Страница 20: ...s 24 V DC GND IN 8 1 2 3 4 5 6 7 8 9 10 IN 7 IN 6 IN 5 IN 4 IN 3 IN 2 IN 1 VDC GND werkseitige Br cken entfernen 1 2 3 4 5 6 7 8 9 10 Operating voltage 24 V DC SELV from the I O module Operating volta...

Страница 21: ...cables are monitored for faults Two floating outputs 2 30 V DC 10 A 2 A Connections with plug in screw terminals CAN CAN 7 3 inputs 7 4 outputs FACP module BS2 BZ 01 3 4 2 2 Remove the terminating res...

Страница 22: ...00 Data points WiNet GW 04 1100 Data points WiNet GW 05 200 Data points WiNet GW 06 1100 Data points An update to 2500 data points is possible 7 1 7 2 7 3 7 4 7 5 3 1 4 1 2 1 2 3 4 1 ON 2 3 Power LAN...

Страница 23: ...onnection of Wildeboer Net to the following open communication protocols Different protocols can also be operated simultaneously with a single gateway Data point definition see page 8 Information is e...

Страница 24: ...tware The OPC UAserver software facilitates the integration of Wildeboer Net into SCADAapplications SCADA supervisory control and data acquisition denotes a computer system in which technical processe...

Страница 25: ...arametrisation Our customer service department can provide supporting instructions on the operation of the software and the system for commissioning For example this includes instruction on generating...

Страница 26: ...0 KNX with 200 Data points WiNet GW 06 Gateway for BACnet Modbus OPC Server DA 2 0 KNX with1100 Data points see pages 22 23 WiNet OPC 01 OPC UA server software see page 24 Automation level BS2 SC 01 S...

Страница 27: ...collected separately for each field module and for each field device Additionally existing identification codes can be applied in accordance with the general identification system GIS Optionally the e...

Страница 28: ...ontroller The field modules within the release group monitor each other using a heart beat signal Simple parametrisation of release group control using a matrix The alarm function for volume flow and...

Страница 29: ...are developed and an EDE file is gen erated by the Wildeboer Net software pc of WiNet GW 03 deliver Manufacturer WILDEBOER install Gateway for the implementation of Wildeboer Net on BACnet IP Modbus...

Страница 30: ...rollers via RS485 or MP Bus Connection of the controllers using spring terminals Mains connection 230 V AC with standard Europlug and 1 5 m connecting line Galvanically isolated bus connections with p...

Страница 31: ...tored for faults Mains connection 230 V AC with stand ard Europlug and 1 5 m connecting line Galvanically iso lated bus connections with plug in screw terminals Manual operation using push buttons LED...

Страница 32: ...WEENER EMS Utrecht K LN Factory Administration Telephone 49 0 4951 950 0 Fax 49 0 4951 950 27120 E mail info wildeboer de Internet www wildeboer eu Utrecht office Telephone 31 30 767 0150 E mail info...

Отзывы: