Glass and Material Lift
GML 800+
30
Operating Manual
GML 800+
Installation GML/K
Conversion from transport position GML/Std.
Set up the lift on firm and level ground only.
Ensure that all caster safety brakes on the chassis are engaged during set up.
Installing the
weight box:
Filling the
weight box:
Installing the
steering arm:
1)
e)
2)
3)
g)
g)
f)
f)
9.
Remove both socket pins (2) from the fitting
pins for the weight box (e).
10.
Position the weight box (1) on the
receptors on both outriggers (e).
11.
Secure the weight box with the socket pins
(2) on both sides and engage the safety
ring on the locking bolts.
12.
Completely fill the weight box with the
counterweights. Stack the counterweights
flatly, one on top of the other, 6 x 16 kg
on each side of the weight box.
WARNING:
Only use lift specific counterweights!
13.
Disengage the spring bolts (f) on the
socket pins (g) at the rear end of both
outriggers and completely remove the spring
bolts. Keep both spring bolts within
easy
reach.
14.
Place the steering arm (3) on both socket
pins (g) and secure it with the previously
removed spring bolts (f).
WARNING:
1.
NEVER operate the GML/K unless the weight box is completely filled!
2.
Never operate the lift with only one outrigger!
3.
Both outriggers must be pointing in the same direction! Otherwise the lift must not be operated!
4.
Never move the lift with a raised load! Only allow for minor position changes.
5.
Avoid sudden movements.
Never move the lift with a raised load!
Only allow for minor position changes.
Avoid sudden movements.
WARNING: