Operating Manual
GML 800+
WARNING:
1. Never operate the lift with only one outrigger!
2. Both outriggers must be pointing in the same direction! Otherwise the lift must not be operated!
3. Never move the lift with a raised load! Only allow for minor position changes.
4. Avoid sudden movements.
Glass and Material Lift
GML 800+
26
GML/K
Transport position:
Set up the lift on firm and level ground only.
Ensure that all caster safety brakes on the chassis are engaged during set up.
Lowering the
outrigger:
Dismantling the
outrigger:
b)
a)
1.
Maintain a firm grip on the outrigger before
you proceed with step 2! The outrigger may
fall unexpectedly.
Always lower the outriggers individually and
one side at a time.
2.
Remove the socket pin (a) completely from
the chassis.
3.
Lower the outrigger carefully until the
wheels are in full contact with the floor
surface.
4.
Loosen the nut and bolt (b) that attach the
outrigger to the chassis. Remove the bolt
completely. Keep the bolt and nut within
easy reach.
5.
Hold the outrigger firmly and remove it
completely from the chassis.
6.
Position the outrigger at the front of the
chassis. Secure the outrigger by inserting
the bolt in slot (b) in the chassis and lock it
in place by tightening the nut.
7.
Insert the safety splint in the upper slot (c)
beside the bolt (b).
8.
Repeat steps 1 - 7 for the second outrigger.
Conversion from transport position GML/K.
Frontal installation of
the outrigger:
Securing the
outrigger: