Operating Manual
GML 800+
WARNING:
1. Never operate the lift with only one outrigger!
2. Both outriggers must be pointing in the same direction! Otherwise the lift must not be operated!
3. Never move the lift with a raised load! Only allow for minor position changes.
4. Avoid sudden movements.
Glass and Material Lift
GML 800+
25
Set up the lift on firm and level ground only.
Ensure that all caster safety brakes on the chassis are engaged during set up.
GML/Std
Transport position:
Lowering the
outrigger:
Securing the
outrigger:
a)
b)
1.
Maintain a firm grip on the outrigger before
you proceed with step 2! The outrigger may
fall unexpectedly.
Always lower the outriggers individually and
one side at a time.
2.
Remove the socket pin (a) completely from
the chassis.
Installing the
handlebar:
6. To bring the handles of the small handlebar
(c) into a horizontal position, remove the
locking pin (d) from the handlebar and raise
the handlebar upwards to the required
position.
3.
Lower the outrigger carefully until the
wheels are in full contact with the floor
surface.
Please note:
The front fixing pin on the chassis (b) works
as an axle when lowering the outrigger.
The outrigger cannot be removed.
Securing the
handlebar:
e)
7. When the handlebar is in a horizontal
position, insert the locking pin into the upper
slot (e) of the adjusting plate to
secure the handlebar.
Please note:
There are a range of slots on the adjusting
plate which offer further settings for the
handlebar to suit the height of the operator.
4.
Place the socket pin in the upper rear slot
(b)
in order to re-connect the outrigger to
the chassis.
5.
Repeat steps 1 to 4 for the outrigger on the
opposite side.
Steering the
lift:
c)
8.
Position yourself behind the mast and
between the outriggers and use the
handlebar (c) to steer the lift.
Installation GML/Std
Converting the lift from transport position to operating position.