
ActiveScale™ P100 Support Guide
53
3. Reconnect the AC power cords.
4. Using ActiveScale SM, verify that the PSU is functional.
a. In the
ActiveScale SM Dashboard
,
click the
Resources
tab.
b. In the system image on the
Resources
page, click the node with the degraded PSU. The node will
have an alert icon. The node's status page will appear.
c. Check that all of the PSU Icons listed under the PSU section do not have alert notifications.
Figure 3-38. PSU failure (left) and online PSU (right) icons
3.3.4 Replacing Storage Nodes
Caution:
The Storage Node weighs 87 lbs (39.46 kg). Two people are required
to move it.
Table 3-19. Storage Node replacement overview
3.3.4.1 Removing a Storage Node
To remove a Storage Node:
1. Shut down the node. If the node is already powered down (for example, because it has failed), skip
this step.
Important:
Do not shut down a node unless all other nodes are healthy.
Figure 3-39. Resources > Rack > Node > Shutdown
Required tools
Personnel required
Replacement time
None
2
60 to 75 minutes
Содержание ActiveScale P100
Страница 103: ...ActiveScale P100 Support Guide 101...
Страница 104: ...ActiveScale P100 Support Guide 102...
Страница 120: ...ActiveScale P100 Support Guide 118...
Страница 124: ...ActiveScale P100 Support Guide 122...
Страница 131: ...ActiveScale P100 Support Guide 129...
Страница 132: ...ActiveScale P100 Support Guide 130...