ActiveScale™ P100 Support Guide
44
1. Align the replacement PSU to the empty slot.
2. Push with even pressure until there is an audible click.
3. Plug the power cord into the new PSU.
4. Replace the blanking panels at the front of the system.
3.2.3 Replacing QSFP+ 40G transceivers
Table 3-14. System Interconnect QSFP+ 40G transceiver replacement overview
3.2.3.1 Removing a System Interconnect QSFP+ 40G transceiver
To remove a QSFP+ 40G transceiver:
1. From the rear of the rack, remove the fiber optic cable from the failed transceiver.
2. Pull the transceiver loop until it is unseated from the port.
3. Remove the transceiver from the System Interconnect.
4. Record the serial number of the faulty component for return purposes.
Figure 3-30. QSFP+ transceiver uninstalled
3.2.3.2 Installing a System Interconnect QSFP+
40G transceiver
To install a replacement QSFP+ 40G transceiver:
Required tools
Personnel required
Replacement time
None
1
5 to 10 min
Содержание ActiveScale P100
Страница 103: ...ActiveScale P100 Support Guide 101...
Страница 104: ...ActiveScale P100 Support Guide 102...
Страница 120: ...ActiveScale P100 Support Guide 118...
Страница 124: ...ActiveScale P100 Support Guide 122...
Страница 131: ...ActiveScale P100 Support Guide 129...
Страница 132: ...ActiveScale P100 Support Guide 130...