![Western Digital ActiveScale P100 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/western-digital/activescale-p100/activescale-p100_support-manual_960960039.webp)
ActiveScale™ P100 Support Guide
37
2. From the rear of rack with the label facing down, insert the SFP+ transceiver into the SFP+ port on the
System Node.
3. Close the latch on the SFP+ transceiver.
Figure 3-22. SFP+ transceiver installation
4. Insert both of the fiber optic cables into the replacement SFP+ transceiver.
5. Check to make sure that the activity LED on the port where the SFP+ transceiver replacement
occurred is blinking steadily. This behavior confirms that data is being transmitted along that port.
3.1.4 Replacing System Nodes
Caution:
The System Node weights
27 lbs (12.2 kg)
. Take precautions when
handling the System Node.
Caution:
Disconnect all power sources before servicing.
Caution:
Verify that the power cables are not damaged. If they are damaged, they
may be a shock hazard and the system may need to be shutdown to replace the
server.
Press
Press
Содержание ActiveScale P100
Страница 103: ...ActiveScale P100 Support Guide 101...
Страница 104: ...ActiveScale P100 Support Guide 102...
Страница 120: ...ActiveScale P100 Support Guide 118...
Страница 124: ...ActiveScale P100 Support Guide 122...
Страница 131: ...ActiveScale P100 Support Guide 129...
Страница 132: ...ActiveScale P100 Support Guide 130...