17
The ceiling panels are installed from inside the module. Each ceiling panel rests on the straight edge of
the ceiling rail above the formed channel and has a channel section attached at each end. The two end
panels also have a channel along one side.
Install the end panels first. Each ceiling end panel has roto lock connections on only one side. This is the
side that will connect to the other ceiling panels. The end panels have only one male roto lock and one
female roto lock.
Note:
Before the ceiling end panels are installed it is necessary to switch a pair of roto locks between
end panels. One of the panels must have two male roto locks and the other panel must have
two female roto locks. Use a Phillips screwdriver to make these changes. Then install ceiling end
panels so the one with female roto locks will be matched with male roto locks on the next ceiling
panel.
To install ceiling panels:
1. Lift one end over the wall and slide the channel on the bottom of the other end into the straight edge
of the ceiling rail as far as it will go.
BE CAREFUL
not to hit the electrical connector when installing
ceiling panels.
2. Lower the other end of the panel into place, then center the ceiling panel so that both channels
extend evenly over the ceiling rails edge.
3. Push both end panels as far to the outside of the end wall as they will go.
install ceiling panels
iNSTallaTiON
CONTiNuEd
Standard Ceiling Panel
End Ceiling Panel
Channel Holddown
Roto Locks
Step 1
Step 2
Содержание V-Ready
Страница 36: ...This page is intentionally blank 36...