13
Note:
If you have a smaller module without a
beam go directly to the next page.
When all wall panels are in place, the ceiling
frame rail system and beam assembly are next to
be installed.
1. Refer to assembly drawing to determine the
Beam location.
2. Position the Beam on top of the Walls.
3. Without delay, attach a bolt at each Beam
end, connecting the Beam ends to the Wall
Panels to prevent the Beam from falling.
ceiling frame rail
(
units with module beam option
)
iNSTallaTiON
CONTiNuEd
Beam
assemble the wall vent panel
continued
To connect to the host building HVAC system
, attach a longer Vent to HVAC Plenum to the wall vent
panel. It extends to the top of the room and terminates with an eight-inch diameter oval adapter that fits
to eight-inch diameter flex ducting.
1. Place the Vent to HVAC Plenum over the wall vent panel outside opening with the Vent to
HVAC Plenum Oval Adapter facing upward as shown in the illustration below.
2. Center the Vent to HVAC Plenum on the wall vent panel with the Vent to HVAC Plenum bottom lip
flush with the wall vent panel bottom.
a. Using the Vent to HVAC Plenum as a template, mark the
location of each Vent to HVAC Plenum mounting hole.
b. Set the Vent to HVAC Plenum aside and drill a 1/8-inch
diameter hole at each mounting hole location.
3. Align the Vent to HVAC Plenum mounting holes to the drilled
wall vent panel mounting holes.
4. Attach the Vent to HVAC Plenum to the wall vent panel with
the screws provided.
The assembled panel is ready to be installed in the module wall
when required.
Vent to HVAC Plenum
Oval Adapter
Содержание V-Ready
Страница 36: ...This page is intentionally blank 36...