Chapter 6
Installation and initial startup
32708885 Geset 100
Version: 16.07.13
Page 33 of 77
GB
Placing the labeling system
¥
The labeling station has to be adapted to the customer’s conveying system in po-
sition and height. The height of the system parts has to be ergonomically de-
signed according to the user’s requirements.
¥
The installed position must allow sufficient access for users and service techni-
cians. In particular at all times, the mains switch / plug must be freely accessible
to disconnect the power supply
¥
Make sure that all fasteners are sufficiently tight.
¥
Observe all of the items under "Intended use" in the chapter “Safety regulations”
on page 13.
Setting up the labeling system
Requirements
¥
The labeling system is unpacked and prepared (see the chapter: "Transport" on
page 28) near the labeling site in the area of the installation site.
¥
The base is solid, level and flat.
¥
The labeling system and if applicable the turning plate must be completely in-
stalled.
¥
The connections for the compressed air and electricity are close to the labeling
site (maximum distance of 1.5 m) as specified in the chapter: "Specifications“ on
page 24.
Required equipment
¥
Flat wrench
¥
Spirit level
¥
If applicable 2-3 persons
Instruction
Set a labeling system up as follows.
Step
Procedure
1
Move the labeling system to installation site. Move labelers without rolls
piece by piece diagonally. Consider all points for "Placing the labeling sys-
tem" on page 33.
2
Adjust the labeling system with an air lever by the adjustable feet horizon-
tally. (With rolls, the brakes have to be locked). See also “Adjust base
conveyor” on page 40.
Connecting the labeling station
The labeling station requires electricity to work. For details see the Chapter:
"Specifications" on page 24.
Содержание Geset 100
Страница 2: ...Blank page ...