SECTION 2: INSTALLATION
The following table specifies the minimum pit depth for the Condensate Neutralizer Tank (P/N
89030C
) if the unit is installed on a
4" pad
, and the pad height if the Neutralizer Tank must be
installed on the floor; note, in all cases a
6” pad
eliminates the need to a pit.
Pad Height Requirement with Neutralizer Tank
Minimum Pit Depth
Pad Height Without Pit
1-
1/4”
5-1/4"
.
Figure 2-3: Condensate Neutralizer Tank Installation
2.4 Lifting Provisions
W A R N I N G !
DO NOT
attempt to lift or move Water Heater using the gas train or blower.
Three lifting lugs are attached to the top of the heat exchanger, as shown below. Remove the
front and rear top panels from the unit to access the lifting lugs. Remove the four (4) lag screws
securing the unit to the shipping skid. Lift the unit off the shipping skid and position it on the
(required) concrete
“housekeeping” pad.
Trap
Support
Housekeeping
Pad
Condensate
Neutralizer
Figure 2-4: Water Heater Lifting Lug Locations
Water Heater