94
PLEASE COMPLETE USING BLOCK CAPITALS.
Service Record 9
Date of Servicing:
1. Service Engineer Details
MCS/SEAI Registration No.
Service Company Name:
Service Company Address:
Contact Telephone No.:
Service Engineer’s Name:
Service Engineer’s Email:
2. Appliance Servicing Checklist
All steps of servicing procedure in WS18/WP18 Technical Manual completed?
Yes
No
Details of additional service items included:
3. System Modifications Since Last Service.
Have there been any modifications made to the heating system since the last service? For example: additional
radiators, additional domestic hot water needs, addition of auxiliary heat sources.
Yes
No
If Yes, Details of Modifications:
4. After Service Performance.
Flue Gas Analyser Make and Model
Calibration Date:
Yes
ü
Fuel Brand:
EN Plus A1?:
CO
2
Concentration (%)
NOTES
CO Concentration (ppm)
O
2
Concentration (%)
Flue Gas Temperature (
⁰
C)
Draught (Pa)
Efficiency (Nett %)
5. Service Completion
Engineer’s Signature
Print Name
Customer’s Signature*
Print Name
* To confirm demonstration of appliance servicing and receipt of this service record
Содержание WS18
Страница 85: ...84 INTENTIONALLY LEFT BLANK...
Страница 97: ...96 9 APPENDIX A SUPPLEMENTARY INSTALLATION AND OPERATING INSTRUCTIONS FOR THE UK MARKET...
Страница 105: ...104 10 APPENDIX B CUSTOMER CONNECTION WIRING SCHEMATIC...
Страница 106: ...105...