THP 94/42 R 4 XXT
THP 125/42 R 4 XXT
THP 140 H/42 R 4 XXT
GB-07.2005
7-32
7.8.3
Filling with water from the mixer
truck
•
Connect the water hose to the Geka-coupling (Item 1,
Fig. 7.39).
•
Open the ball valve (Item 2, Fig. 7.39)
•
Start filling with water; watch the water sight hose (Item
2, Fig. 7.37).
•
Keep filling with water until water emerges from the filler
opening.
7.8.4
Operation in winter
•
The machine must be standing level; level the machine using the circular levels (Item 1, Fig. 5.5 and Item 3, Fig.
5.6).
•
Completely drain all water by opening all ball valves (Item 2, Fig. 7.38 and Item 2, Fig. 7.39).
•
Drain the wash-out tank
1
3
2
Fig. 7.39 Fill with water from the mixer truck