102 Commissioning
WAGO-I/O-SYSTEM 750 XTR
750-352/040-000 FC ETHERNET G3 XTR
Manual
Version 1.3.0
More information about LED signaling
The exact description for evaluating the LED signal displayed is available in the
section “Diagnostics” > … > “LED Signaling”.
Pos: null /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/F eldbusknoten i n Betri eb nehmen/U hrzei t synchronisier en - "WAGO Eth Settings" starten, Scr eenshotbsp, Sychnchr., Schritte 4-6 @ 5\mod_1244644387640_21.docx @ 35261 @ @ 1
4.
Start the “
WAGO Ethernet Settings”
program.
5.
Select the
Date and Time
tab.
6.
Click on the
[Apply]
button.
Pos: null /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/F eldbusknoten i n Betri eb nehmen/Systemzeit synchronisi eren - WBM starten, WBM-Seite "Cl ock", Ei nstellungen, Schritte 1- 5 ohne RTC @ 5\mod_1244644813093_21.docx @ 35264 @ @ 1
Synchronize the system time using the Web-based Management-System
1. Launch a Web browser (e.g., MS Internet Explorer or Mozilla) and enter in
the address bar the IP address you have assigned to your fieldbus node.
2.
Click
[Enter]
to confirm.
The WBM start page is displayed.
3.
Select “Clock” in the left navigation bar.
4.
Enter your user name and password in the displayed query dialog box
(default: user = "admin", password = "wago" or: user = "user", password =
"user"). The WBM page "Clock" is displayed.
5.
Set the current time and date values, as well as the time zone deviation in
the input fields, and select the desired option for the display and Daylight
Saving Time (DST).
Pos: null /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/F eldbusknoten i n Betri eb nehmen/IP-Adresse über das Web-based M anagement-System vergeben - Schritte 6-7 SUBM IT, N eustart @ 5\mod_1244125431662_21.docx @ 34964 @ @ 1
6.
Click on
[SUBMIT]
to apply the changes in your fieldbus node.
7.
Restart the fieldbus node to apply the settings of the Web interface.
Pos: null /Dokumentation allgemei n/Gli ederungselemente/---Seitenwechsel--- @ 3\mod_1221108045078_0.docx @ 21810 @ @ 1