4
VERSION 01/2018
ORDER NUMBER DOC 2385674
TOPFINISH Bell 1S
Connections on Valve Block - 1-Paint
Connections on Valve Block - 2-Paints
Connections on Valve Block - 4-Paints
Connections at Transition Piece
Connections on Control Cabinet (Valve Block - 1-Paint)
Training of Assembly/Commissioning Personnel
Air Quality, Air Quantity and Air Pressure
Typical Electrostatic Spraying System
Setting up Stationary Electrostatic Systems
Assembly of High-Speed Rotary Atomizer on Reciprocator
Ventilation of the Spray Booth
Operating Instructions for Safe Operation
Verifying a Safe Operational Condition
Training the Operating Personnel
Pressure Relief/Work Interruption
Flushing High-Speed Rotary Atomizers (Inside)