44
VERSION 01/2018
ORDER NUMBER DOC 2385674
TOPFINISH Bell 1S
7
OPERATION
7.1
TRAINING THE OPERATING PERSONNEL
The operating personnel must be qualified to operate the entire system.
The operating staff must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2
EMERGENCY DEACTIVATION
In the case of unforeseen occurrences:
1. Switch off control unit.
2. Relieve pressure according to the operating manual of the product pressure
generator.
3. Close the compressed air supply.
7.3
TASKS
Ensure that:
the regular safety checks are carried out in accordance with Chapter
commissioning is carried out in accordance with Chapter
.
7.3.1 ADJUSTING THE SPRAY PATTERN
The spray jet diameter can be adapted individually by modifying the steering air (SA).
Advancement:
kinetic energy via steering air 2.
shape of the spray pattern (small / large) via
steering air 1.
Larger or smaller spray patterns can be achieved by using different bell diameters.
B_06055
Bell
50 mm; 1.97 inch
Notice
1. The flow rate can be changed by:
changing the product pressure or
Use of another nozzle (see Chapter
2. The quality of the distributor and bell are critical for ensuring the spray pattern.
7.3.2 OPERATION WITH 2K MATERIALS
With the 2K variants, there is also the possibility of mixing the product directly at the high-
speed rotary atomizer. To do so, the atomizer can be supplemented and/or modified. When
using a special product tube with a static mixer, the products can be premixed in the static
mixer and further mixed at the bell. The advantage is that the product is mixed just before
it is sprayed. Here, the dosage is to be ensured using a gear dosing system and upstream
paint and hardening blocks. The A-product can be fed via the M-valve. The B-product can