5-6
BA EZ17 en* 1.1 * ez17b500.fm
5 Operation
Uphill machine operation
• Raise the boom 20 – 30 cm (8 – 12 in) off the ground and position it
straight ahead at the center of the machine.
• Do not perform machine travel on slopes steeper than 15°.
• Do not perform machine travel on slopes with a lateral angle of incli-
nation over 10°.
Downhill machine operation
• Raise the boom 20 – 30 cm (8 – 12 in) off the ground and position it
straight ahead at the center of the machine.
• In order to minimize the risk of tipping over, adapt the travel speed to
the circumstances.
• Do not perform machine travel on slopes steeper than 15°.
• Do not perform machine travel on slopes with a lateral angle of incli-
nation over 10°.
On lateral inclinations over 10°, pile up material to create a horizontal, firm
and level standing surface for the machine.
Fig. 78
Fig. 79
> 10°
Содержание E13-01
Страница 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Страница 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Страница 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Страница 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Страница 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Страница 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Страница 243: ...BA EZ17 en 1 1 ez17t900 fm 9 23 Technical data 9 Canopy without extra weight Canopy with extra weight Fig 241 Fig 242...
Страница 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Страница 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...