6-2
BA EZ17 en* 1.1 * ez17t600.fm
6 Transportation
1.
– see chapter “ Towing” on page 2-11
2. Ensure that the machine can be towed safely.
3. Only use towing eye
A
.
4. Secure shackle
B
with the shackle pin and a lock pin.
5. Install towing equipment of appropriate size on the shackle.
6. Start machine travel and tow away slowly.
7. Tow away the machine only until it can travel on its own.
Fig. 180
B
A
Содержание E13-01
Страница 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Страница 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Страница 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Страница 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Страница 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Страница 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Страница 243: ...BA EZ17 en 1 1 ez17t900 fm 9 23 Technical data 9 Canopy without extra weight Canopy with extra weight Fig 241 Fig 242...
Страница 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Страница 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...