
wc_tx001396gb_FM10.fm
88
Burner Setup—Gas
HI750
8.8
Checking the Supply Gas Pressure
Requirements
■
Machine shut down
■
Supply gas turned off
■
Manometer
■
Nipple
Checking
pressure
Perform the procedure below to check and adjust the supply gas pressure.
1. Shut down the machine and allow it to cool.
2. Close the supply gas shutoff valve.
3. Remove the plug
(a)
from the Tee fitting using a hex key.
4. Install a nipple
(b)
into the Tee fitting.
5. Connect the hose of the manometer
(c)
to the nipple.
6. Open the supply gas shutoff valve.
This procedure continues on the next page.
WARNING
Explosion and fire hazard. When combined with air, the gas used for this burner is
explosive. Explosions can cause severe injury or death.
►
Close the supply gas shutoff valve before continuing with this procedure.
►
Extinguish all sources of ignition before continuing this procedure.
a
ghi_gr007058
b
ghi_gr007059
c
ghi_gr007060
Содержание 5000620856
Страница 6: ...ghi_tx001257gb_FM10 fm 6 Foreword HI750 ...
Страница 27: ...HI750 Labels ghi_si000380gb_FM10 fm 27 BB CC FF ...
Страница 115: ...wc_tx003699gb_FM10 fm 115 Kubota Genset Genset Maintenance ...
Страница 122: ...ghi_td000360gb_FM10 fm 122 Technical Data HI750 Notes ...
Страница 135: ...HI750 Schematics ghi_tx001261gb_FM10 fm 135 13 Schematics This page is intentionally left blank ...
Страница 142: ......
Страница 143: ......