17
•
Use a small beaker to collect the acid during
priming.
•
Through the main controls go to RELAY TEST
and open the CIP Pump (
CIP
) by pressing
ENTER. The CIP solution will start flowing
through the CIP line. Once the solution
reaches the beaker, stop the CIP pump by
pressing ESC. Reconnect the check valve.
The CIP line is now primed.
6.9
F
LUSHING THE MODULE
Before normal operation the modules should be flushed for a minimum of 15 minutes. Module flush is a
build in process, please refer to chapter 8.5.
Содержание DiUse
Страница 1: ...DiUse Owner s Manual Installation and Operation...
Страница 33: ...32 P ID...
Страница 34: ...33 PROCESS FLOW DIAGRAM...
Страница 35: ...34 DIUSE INSTALLATION PFD...